Help center
Open dashboard

Agency Brief: Building Your Brand Kit

The brand and business snapshot every AI specialist reads before it reviews a page, writes a line of copy, or proposes a change — and how it layers with project and personal context.

Atarim team Updated 17 Sep 2026 · 20 min read
Getting Started
Atarim AI Web Agency settings showing the agency brief, brand colours and fonts
Before you start

Relevant for

  • Agencies setting up a workspace for the first time
  • Anyone whose AI feedback feels generic or off-brand
  • Teams running white-label clients or sub-brands that need their own voice
  • Agency and Pro accounts — Agency Brief only appears when AI features are enabled

Required knowledge

None

Tools & resources needed

  • Your agency's website URL
  • Your logo, fonts, and brand colours
  • Available AI review credits, to generate automatically
  • Optionally, brand or QA documents as PDF or TXT

Agency Brief is your brand snapshot — what your business does, who it speaks to, how it sounds, and what it looks like. It's the first thing every AI specialist checks before doing anything.

It's also one of three context layers. Your brief sets the workspace default, individual projects can override it, and your own profile decides how the AI explains things to you.

This guide covers all three: how to build your brief section by section, what each part actually changes, and how to override it for one client.

The Three Context Layers

Layer Where it lives What it does
Global Settings > AI Web Agency Your workspace’s brand, business, and voice. Applies to every project unless one overrides it.
Project The project’s own brief Replaces the global brief for one project, client, or campaign.
User Your profile under People Adjusts how the AI explains things to you. Doesn’t affect anything a client sees.
Note
The order matters. If a project has no brief of its own, the AI falls back to your workspace brief — and only reads the page itself if both are empty. An empty global layer means the AI is working from the page and nothing else.

Why It’s Worth Filling In

Your brief isn’t reference material the AI glances at. It’s the reference it’s told to trust above everything else.

It settles disagreements

If a page on your site contradicts your brief, the brief wins. A page is treated as evidence about that page, never as a definition of your business — and the AI flags the mismatch rather than quietly following the page.

It stops the AI improvising

Specialists are instructed to pull exact values from your brief rather than inventing them. Give it your real colours and fonts and it commits to those; leave them blank and it falls back to generic defaults.

It prevents placeholder content reaching your site

The AI won’t invent a real-world value — an email address, phone number, price, or statistic — into content that publishes live. If your brief doesn’t supply it, the field is left out instead of faked.

It tells each specialist what to hold work to

Specialist Domain What it leans on from your brief
Pixel Visual design and brand consistency Brand Assets, Style and Vibe, Design Preferences, Visual Constraints
Lexi Content and tone Tone of Voice, Target Audience, Business Overview
Navi UX and accessibility Target Audience, Project Type
Index SEO and performance Products & Services, Target Audience, Primary Goal
Glitch Functionality, bugs, and QA Project Type, Success Metrics
Note
Claro sits above these five — it reads your request, decides who should handle it, and creates the task, but doesn’t do the work itself. If your workspace is white labelled, clients see your own names for these specialists rather than Atarim’s.

Step-by-Step Guide

Step 1: Opening Agency Brief

Agency Brief sits in workspace settings rather than on a project, because what you set here applies everywhere unless a project overrides it.

Instructions:

  • From the main dashboard, select Settings.
  • In the menu on the left, under AI Web Agency, select Agency Brief.
  • Confirm you’re on Visual Brief — the guided, tabbed view, selected by default.
  • Agency Brief open on the Visual Brief view, with the mode toggle at top right
    Visual Brief Is the Default — the Toggle Sits Top Right

    A toggle at the top of the page switches between two views of the same brief. A tick marks whichever is active.

    View What it is, and when to use it
    Visual Brief A guided editor split into four tabs. The default, and the right choice for a first setup — it prompts you for everything the AI needs.
    Advanced Brief The raw fields behind the tabs, plus a free-text box for your own AI instructions. Use it when the guided sections can’t express something specific.
    Tip
    Start with the Visual Brief. Generate from your URL, see what the AI proposes, and only move to Advanced once you know which fields you want to control yourself.

    Step 2: Generating Your Brief From Your Website

    What this does: reads your site and pre-fills every tab — brand name, project type, audience, tone of voice, colours, and key context — so you’re editing a draft rather than starting from nothing.

    Instructions:

  • Under Project Brief Source:, enter your agency’s website address. The field shows the expected format, example.com.
  • Select Generate Brief. The field and button are disabled while it runs.
  • Wait for the confirmation — a green tick reading Brand Kit ready, with Review and edit below underneath.
  • Work through the four tabs and correct anything that doesn’t fit.
  • Select Save Changes.
  • The status bar sometimes says more than “ready”
    Every generation is graded. A reviewer compares the brief it just built against a screenshot of your real site and scores the match out of ten; when the score comes in below eight, the bar shows it and names the specific mismatches — something like our reviewer scored this 6/10 against the site: buttons are the wrong colour. Treat that as a prompt to regenerate or to correct the fields by hand, not as a failure.

    The bar also says what the crawl did not bring back, naming the fields that came back empty — the logo, the fonts, a primary colour, a headline, tone of voice. A low score or a named gap still leaves you a usable brief; it tells you which parts to check first.
    Brief Source field awaiting a website URL
    Brief Source field ready for a website URL
    URL entered with the Generate Kit button available
    Enter Your URL, Then Select Generate Kit
    Six-step progress view as the AI starts reading the site
    Building your brief progress view showing six steps as the AI begins reading the site
    Progress step extracting colours, typography and logo
    Capturing Your Colours, Type, and Logo
    Progress step analysing site copy for tone and brand values
    Reading the site’s copy to identify tone and brand values
    Progress step detecting the CMS, page builder and analytics
    Identifying the CMS, page builder, and analytics on the site
    Confirmation that the brand kit has been generated
    Brand Kit ready confirmation
    Warning
    Use your agency’s own site, not a client’s. This brief represents your brand and is read across your whole workspace.
    Tip
    If the result describes the wrong company, run it again. Atarim says so on the page — it sometimes finds a different brand with a similar name, and generating once or twice more usually lands on the right one.
    Note
    Generating uses an AI review credit. If you’ve used your allowance the button is disabled, though you can still fill everything in by hand. A failure shows We could not read this site. and the button changes to Try again. Generating with an empty field shows “Please enter a URL”.

    Step 3: Project Overview

    The summary tab, showing your value proposition, primary goal, and brand colours at a glance.

    Why it matters: this is what the AI reads first, and it’s where your primary goal lives. Specialists are instructed to tie every piece of work back to that goal — making it the single field with the widest effect on what you get back.

    Instructions:

  • Open Agency Brief and stay on the Project Overview tab and click on Primary goal
  • Select the Project’s Primary Goal card. This opens the Business Details tab, where the full set of goal fields lives
  • Read the Unique Value Proposition card. Select it to edit.
  • Select the Site preview at the top of Project Overview. A tooltip reads Open Brand Assets, and selecting it takes you to that tab to edit your colours, fonts, and logo.
  • Select Save Changes.
  • Project Overview tab showing the primary goal field
    Every Review Is Weighed Against Your Primary Goal
    Project Overview field in inline edit mode with a confirm tick
    Fields Edit Inline, With Tick to Confirm
    Site preview with a hover control that opens Brand Assets
    Hover the Site Preview to Open Brand Assets
    Note
    Until you generate or fill these in, the cards show prompts instead of content — “No unique value proposition defined yet. Generate a brief to get started.”, “No primary goal defined yet. Generate a brief to get started.”, and “No colors defined yet.”

    .

    Step 4: Business Details

    The commercial context behind your work — what you sell, who to, and what success looks like.

    Why it matters: this is where Index draws your products and goals for SEO work, and where Lexi gets the business context behind copy. It’s also what stops the AI leaving gaps — it won’t invent a price or a metric, so anything not recorded here simply won’t appear in published content.

  • Open Agency Brief and select the Business Details tab.
  • Complete Business Overview — what your business does, in plain terms.
  • Complete Project’s Primary Goal — the one outcome that matters most.
  • Complete Unique Value Proposition — what you offer that others don’t.
  • Add any Secondary Goals.
  • List your Products & Services.
  • Describe your Target Audience.
  • Define your Success Metrics — how you’d know the work succeeded.
  • Select Save Changes.
  • Business Details tab showing the business overview
    Business Overview Sets the Commercial Context
    Business Details field in inline edit mode with a confirm tick
    Each Field Edits Inline, With Tick to Confirm
    Tip
    Primary Goal earns the most attention. Every specialist ties its work back to it, so a vague goal produces vague recommendations across every review

    Step 5: Brand Guidelines

    Your project category, brand personality, communication style, design direction, and visual boundaries.

    Why it matters: these are the fields Pixel checks a design against and Lexi writes to. Fill them in and proposals arrive already matching your style; leave them empty and you’ll spend your time rejecting suggestions instead of using them.

    Instructions:

  • Open Agency Brief and select the Brand Guidelines tab.
  • In Project Type, type a category and press Enter to add it. Add as many as apply — each appears as a tag with an × to remove it.
  • In Style and Vibe, add keyword tags the same way.
  • In Tone of Voice, describe how your brand should sound.
  • Add your preferred visual direction in Design Preferences.
  • Add anything to avoid in Visual Constraints.
  • Select Save Changes.
  • Field What it does Examples
    Project Type The type of website or product you’re building Corporate Website, eCommerce, SaaS Platform, Landing Page, Web App
    Style and Vibe Keywords describing your brand personality or visual style Modern, Clean, Trustworthy, Bold, Minimalist
    Tone of Voice How your brand should sound in writing Professional and informative; friendly and casual; confident and expert
    Inspiration Websites Sites you like, used to guide design direction Any public URL
    Design Preferences Layouts, UI elements, or visual choices you prefer Spacious layout, rounded buttons, strong CTA contrast, minimal navigation
    Visual Constraints Anything that should be avoided or limited No autoplay video, avoid clutter, no excessive animation, avoid dark backgrounds
    Project type and style fields shown as removable tags
    Project Type and Style and Vibe Use Removable Tags
    Design preferences and visual constraints being edited inline
    Design Preferences and Visual Constraints, Edited Inline
    Tip
    Visual Constraints is the field most people skip and most often need. Telling the AI what to avoid is faster than describing everything you want, and it’s what stops Pixel proposing a treatment you’d reject.
    Warning
    Inspiration Websites is filled in automatically when you generate a brief — there’s no field to add sites yourself. Removing one is permanent, and the only way to restore them is Regenerate, which rebuilds the whole brief and overwrites your other edits. A regenerated brief replaces every field rather than keeping the old value where the crawl found nothing, so when it finishes the status bar names anything that came back empty.

    Step 6: Brand Assets

    Your full design system in one place — logo and favicons, colour palette, fonts, spacing and motion values, and the technology detected on your site. It’s more than a logo-and-colours form.

    Why it matters: Pixel is instructed to commit to your existing aesthetic and avoid generic defaults. These values are what it commits to. Without them it has nothing specific to match, and falls back to the safe, anonymous choices you’d recognise anywhere.

    Identity

    Logos and favicons are stored by URL, so the image needs to be reachable online before you add it.

    Instructions:

  • Open Agency Brief and select the Brand Assets tab.
  • Under Identity, select Add a logo, paste the URL of your logo image, then select Add logo.
  • Select any favicon slot — 16×16, 32×32, 48×48, or 96×96 — to upload a replacement or remove it.
  • Palette

    Primary and Accent are yours to set. The Surfaces beneath them are detected from your site, and are worth checking rather than assuming.

    Instructions:

  • Under Primary, select Add a color. Drag on the gradient to choose visually, or type a hex value into the field beneath it, then select Add color.
  • Do the same under Accent for your supporting colours.
  • Review Surfaces — Canvas, Subtle, Brand soft, Inverted, and Atmospheric. These are detected from your site, and you can add more or adjust them.
  • Select a swatch to change a colour, or select its label or hex value to rename it. Hover any card to reveal its delete button.
  • Typography

    Fonts come from Google Fonts, so anything outside that library has to be handled elsewhere.

    Instructions:

  • Under Typography, select Add a font. Search Google Fonts by name — each result previews in its own typeface — then select one and assign it a role.
  • System

    These four groups are what give generated work its house feel — corners, depth, pace and spacing.

    Instructions:

  • Under Radius, set the corner radius for Button, Card, Input, and Image.
  • Under Shadows, set the three elevation tiers.
  • Under Motion, set durations in milliseconds for Fast, Normal, and Slow.
  • Under Layout, set Container max width and Gutter in pixels.
  • Tech stack

    Leaving a field blank tells the AI there is nothing to assume, which beats letting a wrong default stand.

    Instructions:

  • Review CMS, Builder, Frontend runtime, and Meta framework. Override any field, or leave it blank for none.
  • Scroll to the bottom and select Save Changes.
  • Field What it does Examples
    Logo & Favicon Your main logo and favicon, for brand recognition and consistency PNG or SVG
    Typography The fonts used across your site, product, or marketing Inter, Poppins, Roboto, Helvetica
    Primary Colors Main colours used in logos, buttons, backgrounds, and core UI #635BFF #0A2540 #FFFFFF
    Accent Colors Supporting colours for highlights, icons, badges, and secondary UI #00D4FF #36CFC9 #F5F7FA
    Brand Assets tab opening with identity and palette sections
    Identity and Palette Start the Brand Assets Tab
    Palette section listing primary, accent and surface colours
    Palette Holds Primary, Accent, and Surface Colours
    Colour picker with a hex input field
    Pick a Colour Visually or Enter a Hex Value
    Google Fonts search with a live preview of each typeface
    Search Google Fonts, With a Live Preview of Each
    Component previews restyling as brand values change
    Components Restyle Live as You Change Your Brand Values
    System settings for corner radius, shadows and motion
    System Sets Radius, Shadows, and Motion
    Detected tech stack with override controls
    Tech Stack Is Detected, and You Can Override It
    Note
    Colours added here appear as the Brand Kit section on Project Overview. Some brand and technology signals are also detected automatically when a site is scanned — those aren’t editable here, since this page is for the values you set deliberately.

    Step 7: The Advanced Brief

    The same brief, shown as raw fields instead of guided tabs, with a free-text box for instructions you write yourself.

    Why you’d use it: when the guided sections can’t express something specific about how you work, or when you want standing instructions the AI follows on every request.

    Instructions:

  • Open Agency Brief.
  • Select Advanced Brief in the toggle at the top of the page.
  • Read the Are you sure? dialog. It explains the visual brief can no longer be displayed, and only Advanced Brief content will be used for AI responses.
  • Select Switch to Advanced Brief, or Keep the Visual Brief to cancel.
  • Complete the fields shown on screen.
  • Optionally add supporting documents in the upload area beneath them.
  • Select Save Changes.
  • Field What it does
    Brand Name Your company or product name
    Project Type The category that best matches your website or business — eCommerce, SaaS Platform, Corporate Website, Web App
    Target Audience The users or customers you want to reach
    Tone of Voice How your brand should sound in communication
    Add Custom AI Guidelines Standing instructions for the AI to follow — “focus on conversion clarity”, “keep messaging concise”, “prioritise trust signals”
    File uploads PDF or TXT files providing additional brand or project context
    Warning shown before switching to the Advanced Brief
    Warns You Before the Switch
    Advanced Brief toggle at top right in its active state
    Toggle Sits Top Right, Ticked When Active
    Advanced Brief showing plain text fields for direct editing
    Plain Text Fields You Edit Directly
    Context Files section inside the Advanced Brief
    Context Files Live Here Too, Not Just on Their Own Page
    Warning
    Switching has consequences in both directions. Once you’re on the Advanced Brief, only its content feeds AI responses. Switching back may lose some or all of the detail you entered — copy anything you want to keep first.
    Note
    Files added here are PDF and TXT only, and are staged until you select Save Changes. A file still showing a New badge hasn’t been stored.

    Step 8: Adding Context Files

    A separate library of supporting documents — brand guidelines, QA checklists, tone-of-voice docs, policies.

    Why it matters: the AI reads them as background reference during page reviews and chat, so you don’t repeat your standards in every request. Upload a QA checklist once and reviews follow it; upload a privacy policy and you can ask how well a page communicates your data practices.

    Uploading Your Files

    Context files carry what a brand kit cannot — tone guides, past proposals, anything you would hand a new hire.

    Instructions:

  • From the main dashboard, select Settings.
  • Under AI Web Agency, select Context Files.
  • Find the section headed Provide better context with file uploads.
  • Drag files onto the dashed upload area, or select Choose files to browse. While you drag, the area fills with a prompt reading “Drop PDF and TXT files here”.
  • Confirm your files appear in the grid below the upload area. Each card shows the filename, the file type in capitals, and a small icon. Files you have not saved yet carry a New badge in the top-right corner.
  • Select Save Changes to store them.
  • File upload area with drag-and-drop and a Choose Files button
    Drag Files In, or Select Choose Files
    Warning
    Context Files is its own page under AI Web Agency — it isn’t a tab inside Agency Brief. Only PDF and TXT are accepted, and uploads are staged until you select Save Changes.
    Note
    Uploads are staged until you select Save Changes. If you leave the page while a file still shows the New badge, that file is discarded.
    Tip
    Several focused files beat one large document. Atarim notes this on the page — RAG-optimised files produce better results.

    Step 9: Giving One Client Their Own Brief

    A brief that belongs to a single project, separate from your workspace one.

    White-label clients and sub-brands need their own voice. A project brief keeps that client’s tone, audience, and brand details attached to their project alone.

    Opening a Project Brief

    The project brief is the per-project layer, and it overrides the agency-wide brief wherever the two disagree.

    Instructions:

  • Open the project’s dashboard.
  • In the top bar on the right, select the document icon. Hovering it shows the tooltip Project brief. It sits immediately left of the gear icon for Project settings.
  • The Project Brief modal opens.
  • Option to generate a project brief for a client
    Generate a Client’s Project Brief
    Project brief opened from the client's project dashboard
    Client’s Brief Straight From Their Project Dashboard
    Website Owner generating a brief from their own dashboard
    Website Owner (Client) generating from their own dashboard
    Brief generation started from the Collaborate view
    Either party generating from Collaborate
    Tip
    There is also a Project Brief item in the Collaborate bottom bar menu, but it may open a panel titled AI Settings instead. That version covers the same four tabs with different button labels — Generate Brief rather than Generate Kit, and Save Settings rather than Save Changes — and it carries a Use Global Settings toggle the dashboard version does not have. Use the project dashboard route above if you want the behaviour described in this article.
    Note
    Use Go to Global Settings to jump back to the workspace-level brief. Leaving global settings on means one change there updates every project that inherits it.

    Step 10: Setting Your Own Profile

    Your role and experience level, held on your user profile rather than in the brief.

    Why it matters: your role sets what you can do; your experience level sets how things are explained to you. It’s deliberately separate from brand voice — anything a client sees follows the brief regardless of your setting.

    Instructions:

  • Select People in the sidebar.
  • Select your own name from the list.
  • Under Which of these describe you best?, choose every role that applies.
  • Scroll to Level of experience and pick one.
  • Your selections save automatically.
  • Experience level What changes
    I’m a beginner Clear, supportive feedback with detailed explanations of why
    I’m an intermediate Balanced, practical advice that builds on existing knowledge
    I’m an expert Advanced, detailed feedback with technical depth
    I’m the final boss Concise, high-level insights and strategic recommendations
    Profile step with selectable role checkboxes
    Tick Every Role That Applies

    The role options are: Web Designer, Content Creator / Copywriter, UI/UX Designer, QA / Tester, Web Developer, Product Manager, Project Manager, Marketing Professional, Agency Owner / Freelancer, Internal Team Member, and Other.

    Note
    These settings personalise your experience only — they don’t affect how the AI talks to anyone else on your team, and they never change client-facing copy.
    Tip
    Set your level honestly rather than aspirationally. Picking a lower level gets you the reasoning behind a recommendation, not just the recommendation.

    FAQs

    Does generating a brief use credits?

    Yes. Generating is an AI action and draws on the same pool as page reviews, task chat, and workflows. It appears in Settings > AI Web Agency > Credits & Usage as “generated brand guidelines”, with the person who ran it and the date. Editing fields by hand costs nothing.

    What happens if I run out of credits?

    The generate action becomes unavailable, but the brief itself doesn’t lock. You can still build or correct it by typing into the fields directly.

    The generated brief describes the wrong company. What now?

    Run it again. Atarim flags this on the page itself — it sometimes finds a different brand with a similar name, and generating once or twice more usually lands on the right one. That’s faster than correcting every field by hand.

    Generation failed. What does that mean?

    The set-up view shows We could not read this site. with “The page blocked our crawler or timed out. Check the URL is public and try again.” underneath, and the button changes to Try again. Submitting with an empty field shows “Please enter a URL” instead. Neither state loses anything you’d already entered. A firewall, WAF or IP restriction can present as any kind of read failure, so if your site sits behind one, see how to whitelist Atarim.

    The brief generated but the colours and fonts are wrong.

    That is a different state from a failed generation. The status bar reads Brand assets unavailable and says the brief below is still usable, but its colours, fonts and logo are not the real ones. Regenerate to try again.

    What happens if I leave my Agency Brief empty?

    The AI has nothing specific to match, so it falls back to generic defaults for things like colour and type. It still won’t invent real-world values — an email address, phone number, price, or statistic left unrecorded is omitted from published content rather than faked.

    What’s the difference between the Visual Brief and the Advanced Brief?

    They’re two views of the same brief. The Visual Brief is a guided editor split into four tabs and is the default. The Advanced Brief shows the raw fields plus a free-text box for standing instructions you write yourself. Start with Visual and move to Advanced only when the guided sections can’t express something.

    Will I lose my work if I switch to the Advanced Brief?

    Atarim warns you first with an Are you sure? dialog. Once you switch, only the Advanced Brief’s content feeds AI responses, and switching back may lose some or all of the detail you entered. Copy anything you want to keep before switching either way.

    Does a project brief inherit from my Agency Brief?

    No. A project brief is always specific to that project and starts blank, no matter what your workspace brief contains. It also means editing your workspace brief never updates a project brief that already exists — client briefs are maintained per project.

    Does turning off Enable Global Settings change a project’s brief?

    No. That switch lives in Project Settings and governs the project’s white-label only — logo, favicon, custom logo URL, and brand colour. Project Settings and Project Brief are separate screens behind separate buttons.

    I uploaded a file and it’s gone. Why?

    Uploads are staged, not stored. A file showing a New badge hasn’t been saved yet, and leaving the page discards it. Select Save Changes to keep it.

    Does my experience level change what my clients see?

    No. Your role and experience level sit on your own user profile and adjust how things are explained to you. They don’t affect how the AI talks to anyone else on your team, and they never change client-facing copy — that always follows the brief.

    There’s no save button on my profile. Are my selections saving?

    Yes. Roles and experience level save on their own about two seconds after you stop making changes. Pause briefly before navigating away, or the last change won’t stick.

    Related articles